Construction Update- South Albany Street Bridge Project
PROJECT NAME: South Albany Street Bridge Replacement Project
PROJECT LOCATION: South Albany Street Bridge
PROJECT START DATE: May 15, 2023.
SCHEDULED COMPLETION DATE: December 31st, 2023.
PROJECT DESCRIPTION AND GOAL: The project will replace the existing bridge with a new 85-foot, single-span structure consisting of two 13-foot shared travel lanes (to accommodate vehicles and bicycles) and new 8’-0” sidewalks on both sides of the bridge.
LOCAL IMPACTS: The bridge will be closed during construction, and Traffic will be diverted along Wood Street, South Plain Street, and West Clinton Streets.
For additional information contact: Addisu Gebre, P.E., PMP, Bridge Systems Engineer, DPW - Engineering (607) 274-6530